1a. Enter the applicable values
1b. Enter all values
Support
- Technical Support
- techsupport@stenner.com
- 800-683-2378
Key
- PPM - Parts Per Million
- GPD - Gallons Per Day
- GPM - Gallons Per Minute
- PPG - Pulse Per Gallon
Dosage Required (using oxidative rates) source: Table 8-2, Chapter 8, “Residential Water Processing”, Water Quality Association, Lisle, IL., 2000.
Metering Pump Output source: Page 120, Chemical Feed Information, USA Bluebook Operator’s Companion, 6th Edition.
2. Select the pump maximum GPD greater than the output GPD calculated in 1. Refer to chart.
Item Number Prefix | Maximum GPD |
---|---|
45MFH1 | 3.0 |
45MFH2 | 10.0 |
45MFH7 | 22.0 |
85MFH1 | 5.0 |
85MFH2 | 17.0 |
85MFH7 | 40.0 |
3. Select the Water Meter PPG. Refer to chart.
IMPORTANT: If the Injection Time is greater than the Available Dose Time, select a pump with a higher output and repeat 2-4.
Size | PPG | Item Number |
---|---|---|
3/4" | 1 | JLP0750-1PPG |
3/4" | 2 | JLP0750-2PPG |
3/4" | 4 | JLP0750-4PPG |
3/4" | 10 | JLP0750-10PPG |
1" | 1 | JLP1000-1PPG |
1" | 2 | JLP1000-2PPG |
1" | 4 | JLP1000-4PPG |
1.5" | 1 | JLP1500-1PPG |
1.5" | 2 | JLP1500-2PPG |
1.5" | 4 | JLP1500-4PPG |
Size | PPG | Item Number |
---|---|---|
2" | 1 | SSMRS20-1PPG |
2" | 2 | SSMRS20-2PPG |
2" | 4 | SSMRS20-4PPG |
4. Select a maximum PCM Operating Time less than the Available Dose Time calculated in 3. Refer to chart.
Model | Operating Time Seconds |
---|---|
PCM1 | 0.1 to 1.0 |
PCM5 | 0.5 to 5.0 |
PCM10 | 1.0 to 10.0 |
PCM20 | 2.0 to 20.0 |
5. Set the PCM potentiometer to the PCM setting % calculated in 4.