Skip to main content

Sizing

References

1a. Enter the applicable values

1b. Enter all values

Cannot be zero

All fields above are required
Support
  • Technical Support
  • techsupport@stenner.com
  • 800-683-2378
Key
  • PPM - Parts Per Million
  • GPD - Gallons Per Day
  • GPM - Gallons Per Minute
  • PPG - Pulse Per Gallon

Dosage Required (using oxidative rates) source: Table 8-2, Chapter 8, “Residential Water Processing”, Water Quality Association, Lisle, IL., 2000.

Metering Pump Output source: Page 120, Chemical Feed Information, USA Bluebook Operator’s Companion, 6th Edition.


2. Select a pump maximum GPD greater than the output GPD calculated in 1. Refer to chart.

 

Flow Rate Outputs 80 psi max
Econ FP | Econ Integrator™
Item Number Prefix
Maximum
GPD
E10PLM | E10RLM 0.49
E10PHM | E10RHM 0.83
E20PHM | E20RHM 1.41
E20PHF | E20RHF 4.5
E20PHG | E20RHG 16.0
E20PHH | E20RHH 30.0
Flow Rate Outputs 100 psi max
S10P
Item Number Prefix
Maximum
GPD
S3P01 5.0
S3P02 17.0
S3P06 30.0

3. Select the Water Meter PPG. Refer to chart.

 

Must select values in Step 2 and 3
Must select values in Step 2 and 3

IMPORTANT: If the Injection Time is greater than the Available Dose Time, select a pump with a higher GPD and repeat 2-4.

 

Plastic Meters
Size PPG Item Number
3/4" 1 JLP0750-1PPG
3/4" 2 JLP0750-2PPG
3/4" 4 JLP0750-2PPG
3/4" 10 JLP0750-10PPG
1" 1 JLP1000-1PPG
1" 2 JLP1000-2PPG
1" 4 JLP1000-4PPG
1.5" 1 JLP1500-1PPG
1.5" 2 JLP1500-2PPG
1.5" 4 JLP1500-4PPG
Stainless Steel Meters
Size PPG Item Number
2" 1 MNLRS20-1PPG
2" 2 MNLRS20-2PPG
2" 4 MNLRS20-4PPG

4a. In the pump’s Seconds mode, select a maximum operating time that is greater than or equal to the injection time calculated in 3.

4b. Calculate the percentage the injection time is of the maximum operating time selected in 4a.

x% = injection time/max. operating time x 100
The injection time cannot be less than 10% of the pump’s maximum operating time. 

Set the percentage.